2 hasil untuk "B. PARAMASIVAM"
Menampilkan 1–2 · 0,38 detik · RSS
-
Artikel Jurnal Teks lengkap
ANCILLARY SERVICE REQUIREMENT BASED AUTOMATIC GENERATION CONTROL ASSESSMENT IN A DEREGULATED POWER SYSTEM WITH HES AND IPFC UNITS
This paper intends the evaluation measures for obtaining the Ancillary ServicesRequirement (ASR) indices stand on Automatic Generation Control (AGC) in a deregulated power system.Ancillary services are vital to support the transmission of electric power from vendor to user with the responsibility…
-
Artikel Jurnal Teks lengkap
OPTIMAL ALLOCATION OF TCSC DEVICES FOR THE ENHANCEMENT OF ATC IN DEREGULATED POWER SYSTEM USING FLOWER POLLINATION ALGORITHM
This paper proposes a best possible distribution of Thyristor Controlled Series Compensator (TCSC) to progress the Available Transfer Capability (ATC) of power transactions between sources and sink areas in the deregulated power system. The principle of TCSC device is to balance the inductive…