5 hasil untuk "Rashed Sahraeian"
Menampilkan 1–5 · 0,40 detik · RSS
-
Artikel Jurnal
A Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job…
-
Artikel Jurnal
A probabilistic multi objective CLSC model with Genetic algorithm-ε_Constraint approach
In this paper an uncertain multi objective closed-loop supply chain is developed. The first objective function is maximizing the total profit. The second objective function is minimizing the use of row materials. In the other word, the second objective function is maximizing the amount of…
-
Artikel Jurnal Teks lengkap
A New Method Based on Simulation-Optimization Approach to Find Optimal Solution in Dynamic Job-shop Scheduling Problem with Breakdown and Rework
In this paper we propose an integrated algorithm based on combination of a discrete- event simulation and genetic algorithm. The simulation model is considered as a constraint-satisfaction procedure and if the streaming operations are initiated, then the meta-heuristic takes predefined steps to…
-
Artikel Jurnal Teks lengkap
Two-echelon Supply Chain Considering Multiple Retailers with Price and Promotional Effort Sensitive Non-linear Demand
This study deals with the effects of a supply chain (SC) with single product, multiple retailers and a manufacturer, where the manufacturer(he) produces lotsize of the product that contains a random portion of imperfect quality item. The imperfect quality products are sold in a secondary shop. The…
-
Artikel Jurnal
A hybrid augmented epsilon-constraint approach for bi-objective flexible job shop scheduling considering age, workload, and processing speed in failure modeling
Machine breakdowns directly affect scheduling performance and production costs in manufacturing systems. Instead of focusing on reactive measures after failures, managing the factors that cause failures beforehand can help reduce them. To address these issues, this paper proposes a flexible job…