Biblio Discovery — Demo Discovery Service

4 hasil untuk "Rateb Sweis"

Menampilkan 1–4 · 0,28 detik · RSS

  1. Artikel Jurnal Teks lengkap

    Barriers to Adopting Lean Construction in the Construction Industry—The Case of Jordan

    Wassim Al Balkhy; Rateb Sweis; Zoubeir Lafhaj

    Buildings, Vol. 11 No. 6 · 2021 · Inggris · DOAJ Scopus

    During the last few decades, there has been a greater understanding of the role of lean construction (LC) in achieving better management of construction projects and enabling the application of the fourth industrial revolution in the construction industry (Construction 4.0), which in turn, has the…

  2. Artikel Jurnal Teks lengkap

    Factors Affecting Risk Management in Industrial Companies in Jordan

    Nadia Abu Kwaik; Rateb Sweis; Baraa Allan dkk.

    Administrative Sciences, Vol. 13 No. 5 · 2023 · Inggris · DOAJ Scopus

    This study aims to identify and rank the critical factors affecting risk management from the perspective of top and Lower Management in Jordanian industrial companies. Based on a rigorous literature review, critical factors affecting risk management are factors related to (1) flexibility and…

  3. Artikel Jurnal Teks lengkap

    Factors Affecting Occupants’ Satisfaction in Governmental Buildings: The Case of the Kingdom of Bahrain

    Noora Albuainain; Ghaleb Sweis; Wassim AlBalkhy dkk.

    Buildings, Vol. 11 No. 6 · 2021 · Inggris · DOAJ Scopus

    Satisfaction is a very important factor in improving productivity and performance in the work environment. This study aims to investigate the levels of occupants’ satisfaction with the indoor environmental quality (IEQ) in the governmental buildings in the Kingdom of Bahrain and to investigate the…

  4. Artikel Jurnal

    Enhanced Construction Project Duration Estimation Using Artificial Neural Networks: Initial Design and Planning Stages

    Heba Al-Attar; Ghaleb Sweis; Bashar Tarawneh dkk.

    Construction Economics and Building, Vol. 25 No. 2 · 2025 · Inggris · DOAJ Scopus

    Maintaining efficiency and quality control during the early phases of construction projects depends on accurate duration estimation. However, because there is not enough data available in the initial stages of project planning, traditional methodologies suffer. To address these challenges, this…